Calypso Telescope Maintenance Schedule:
August

Task Date Completed Completed By:
Monthly    
     
CO2 Cleaning of mirror    
Run Generator for 15 minutes    
     
     
Semi Annually    
     
Servo Periodic Error Tuning    
Wash Mirrors with Soap and Water    
Wipe down outer surfaces of Telescope    
     
     
Annually    
     
Vent, Pump and Bake Dewars    
Air Compressor Service    
Generator Service (Oil Change, Load Test)    
     
     
     
     
Other Unscheduled Maintenance    
     
Table of Contents  |  July  |  September

Calypso Telescope  •  Kitt Peak, AZ  •  06489

Phone: (520) 318-8775  •  Fax: (520) 318-8776  •  e-mail: engineer@calypso.org

calypso.org

Updated 9/13/02 - BET